Belgrade heating plants

Belgrade heating plants

beogradske-elektrane-2

Public utility company Beogradske elektrane (Belgrade heating plants), as part of the critical infrastructure of the capital, devote special attention to the investment maintenance of their plants. We had the privilege of participating in previous years (2017-2018) in projects that prepared these exceptional plants for continuous and reliable work during the winter months. Our  tasks were:

Heat-only boiler station Novi Beograd (2018) - Configuration, testing and commissioning of 6kV substation (26 cells) with the integration of the plant into the energy and process SCADA. Configuring, testing and commissioning of SCADA 6kV substation with the integration of new and existing relays (total of 40 relays from different manufacturers).

Heat-only boiler station Dunav (2018) - Configuration, testing and commissioning of 35kV substation (5 cells) and 6kV substation (25 cells) with the integration of the plant into the energy and process SCADA.

Heat-only boiler station Cerak (2018) - Configuration, testing and commissioning of 35kV substation (5 cells), 10kV substation (5 cells) and 6kV substation (18 cells).

Heat-only boiler station Novi Beograd (2017) - Preparation and consulting services during the production process of protection and management box, FAT, SAT, configuration, testing and commissioning of the protection system at 110 kV substation. Development of communication relay setting for work according to protocol IEC 61850. Implementation of the SCADA application program in substation 110kV with testing and commissioning. Training of users. Implementation of the SCADA application program of the substation 6kV with testing and commissioning.

Let's be in touch.

It is a pleasure to meet new people.

Electroconsult logo beli

Gorana Kovačića 3
Novi Sad
Serbia

+381 21 66 10 743
office@electroconsult.rs
vladislav.lazendic@electroconsult.rs
simo.brstina@electroconsult.rs

© 2018 Electroconsult. Made by Websites Workshop